The existing surface was not level, having been repaired on numerous occasions over the years and an old kiosk had left a large infill after being removed.
Network Rail requested a seamless, aesthetic resin floor to replace its previous tiled finish and Flowcrete UK was more than happy to oblige with its MMA flooring system, Flowfast Terrosso.
The work had to be carried out in sections throughout the night due to the toilets having to be in use the following morning at 6am. With that in mind the floor was completed over three evenings.
The Flowfast Terrosso flooring system provides a seamless, decorative, hardwearing acrylic resin floor finish and has been developed for high traffic commercial environments. It is ideal for fast track applications, therefore dramatically reducing disruption.
Overlaying the old tiled finish with 150m2 of the new flooring solution, which has an in-built methyl methacrylate catalyst, meant that the installation time was greatly reduced and the project was completed within three evenings rather than a number of weeks.
This website uses cookies and other tracking technologies (also known as pixels or beacons) to aid your experience (such as viewing videos), as well as “performance cookies” to analyse your use of this website and to assist with marketing efforts. If you click the "Accept All Cookies" button or continue navigating the website, you agree to having those first and third-party cookies set on your device. If you do not wish to accept cookies from this website, you can choose to not allow cookies from this website by updating your browser preferences. For more information on how we use Cookies, please read our privacy policy.
Accept All Cookies